Cross Cut Management
Rehabilitation

Cross Cut Management

Rehabilitate cross-cuts — mud loading, drains, rail and track.

Titan Mining have specialised teams to rehabilitate cross cuts. Our crews load mud in the haulages and cross cut sections, grade and re-align tracks, and re-install drains, pumps, piping and drain columns.

Our Rail and Track Rehabilitation teams replace rails, sleepers and drains, rebuild bunt walls, and perform rail maintenance and ballasting.

We measure and manufacture step-up fish plates to correct horizontal alignment, with pre-stressed sleeper support fitting beneath the fish plate joint for additional support. Rail shims are manufactured to correct gaps between rails at joints.

Price on request — contact us for a quote tailored to your operation.

Gallery

Installed underground

Flooded crosscut
Rehabilitated crosscut
Uncontrolled slurry runoff
Concrete side drain
Concreted track and drain
Concreted rail switch
Completed crosscut section
Haulage cleared
Clear track through the crosscut
Cleared crosscut curve
Loading out mud
Water ingress in the crosscut
Muddy track
Barricaded work area
Rehabilitated haulage